Case Study Information
Project Type: Slope Protection
Project Type (Other): Government
Project Start Date: December 2025
Project Objective:
The objective of this project is to protect slopes from surface erosion.
Project Location: West Kotawaringin Regency, Central Kalimantan
Number of Installers: 6
Amount of Concrete Canvas Used: 475 m²
Roll Format: Bulk Roll
Type/Thickness: CCX-M
Installation Method (Layup): Vertical
Installation Process
Equipment used
- Excavator
- Cutter/utility knife
- J-Pin 25 cm
- 30 mm stainless steel screws
Alternatives and Reasons for Choosing Concrete Canvas
The initial specifications called for stone masonry, but the contractor needed to expedite the work to meet the already delayed schedule. Concrete Canvas was the solution because it was easier, more flexible, and faster to install than previous materials.
Land Preparation
- Channel profile formation (re-shaping)
Installation, Bonding, and Sealing Methods
The Concrete Canvas CCX-M is installed vertically. Fastening is done using 30 mm stainless steel screws spaced 10 cm apart at each overlap. Additionally, 25 cm J-Pins are installed at each connection in the anchor trench at the toe and crest of the slope to ensure the Concrete Canvas adheres perfectly to the soil substrate.
Hydration Method
The hydration process is carried out using a hose connected to a water pump, with the water source coming from a nearby pond around the project site.
Installation Duration
Land preparation and installation of Concrete Canvas was carried out in 2 days by 6 workers.
Project Success
The project was deemed a success. The client was satisfied with the speed of installation. The client plans to continue the installation and make repeat purchases next year.